<?xml version="1.0"?>
<oembed><version>1.0</version><provider_name>The National Economic and Development Authority</provider_name><provider_url>https://www.neda.gov.ph</provider_url><author_name>Public Relation</author_name><author_url>https://www.neda.gov.ph/author/neda-prd/</author_url><title>BUILD, BUILD, BUILD TO CUT TRANSPORT COST &#xA0;TO OVER PHP2-B IN 2022 &#x2013; INFRACOM - The National Economic and Development Authority</title><type>rich</type><width>600</width><height>338</height><html>&lt;blockquote class="wp-embedded-content"&gt;&lt;a href="https://www.neda.gov.ph/build-build-build-to-cut-transport-cost-to-over-php2-b-in-2022-infracom/"&gt;BUILD, BUILD, BUILD TO CUT TRANSPORT COST &#xA0;TO OVER PHP2-B IN 2022 &#x2013; INFRACOM&lt;/a&gt;&lt;/blockquote&gt;
&lt;script type='text/javascript'&gt;
&lt;!--//--&gt;&lt;![CDATA[//&gt;&lt;!--
		/*! This file is auto-generated */
		!function(c,d){"use strict";var e=!1,n=!1;if(d.querySelector)if(c.addEventListener)e=!0;if(c.wp=c.wp||{},!c.wp.receiveEmbedMessage)if(c.wp.receiveEmbedMessage=function(e){var t=e.data;if(t)if(t.secret||t.message||t.value)if(!/[^a-zA-Z0-9]/.test(t.secret)){for(var r,a,i,s=d.querySelectorAll('iframe[data-secret="'+t.secret+'"]'),n=d.querySelectorAll('blockquote[data-secret="'+t.secret+'"]'),o=0;o&lt;n.length;o++)n[o].style.display="none";for(o=0;o&lt;s.length;o++)if(r=s[o],e.source===r.contentWindow){if(r.removeAttribute("style"),"height"===t.message){if(1e3&lt;(i=parseInt(t.value,10)))i=1e3;else if(~~i&lt;200)i=200;r.height=i}if("link"===t.message)if(a=d.createElement("a"),i=d.createElement("a"),a.href=r.getAttribute("src"),i.href=t.value,i.host===a.host)if(d.activeElement===r)c.top.location.href=t.value}}},e)c.addEventListener("message",c.wp.receiveEmbedMessage,!1),d.addEventListener("DOMContentLoaded",t,!1),c.addEventListener("load",t,!1);function t(){if(!n){n=!0;for(var e,t,r=-1!==navigator.appVersion.indexOf("MSIE 10"),a=!!navigator.userAgent.match(/Trident.*rv:11\./),i=d.querySelectorAll("iframe.wp-embedded-content"),s=0;s&lt;i.length;s++){if(!(e=i[s]).getAttribute("data-secret"))t=Math.random().toString(36).substr(2,10),e.src+="#?secret="+t,e.setAttribute("data-secret",t);if(r||a)(t=e.cloneNode(!0)).removeAttribute("security"),e.parentNode.replaceChild(t,e)}}}}(window,document);
//--&gt;&lt;!]]&gt;
&lt;/script&gt;&lt;iframe sandbox="allow-scripts" security="restricted" src="https://www.neda.gov.ph/build-build-build-to-cut-transport-cost-to-over-php2-b-in-2022-infracom/embed/" width="600" height="338" title="&#x201C;BUILD, BUILD, BUILD TO CUT TRANSPORT COST &#xA0;TO OVER PHP2-B IN 2022 &#x2013; INFRACOM&#x201D; &#x2014; The National Economic and Development Authority" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" class="wp-embedded-content"&gt;&lt;/iframe&gt;</html><thumbnail_url>http://www.neda.gov.ph/wp-content/uploads/2018/09/DSC_0149.jpg</thumbnail_url><thumbnail_width>2144</thumbnail_width><thumbnail_height>1424</thumbnail_height><description>August 09, 2019 MANILA &#x2013; Aside from reducing traffic congestion, the completion of projects under the Build, Build, Build program will drastically cut transport cost in Metro Manila from PhP3.5 billion per day in 2017 to PhP2.13 billion per day in 2022, according to the National Economic and Development Authority Board&#x2019;s Committee on Infrastructure (INFRACOM). continue reading :</description></oembed>
